GROUNDING SYSTEM FOR MACHINE CONSIGNMENT

INSTALLATION OF A NEW GROUNDING SYSTEM:
The system was installed by the BH2M technical team over several days during which the following phases took place:

- Supply and installation of a network of new copper bars on site
- Connection of ceramic insulators
- Realization of new wiring with lugs and ground connection clamps
- Replacement of phase/neutral output connection points with partial isolation recovery