AIR/WATER STATOR COOLING SYSTEM

As part of the refurbishment of 3 generator-motors, BH2M supplied 26 air/water coolers

This project has been performed in several major steps:

- On-site measurements to fully adapt the product to existing machines
- The design taking into account the integration with the existing piping system in order to minimize the installation time during changeover
- The resizing of the coolers according to the validated parameters (capacity (kW), air flow, temperature offset, etc.)
- The choice of materials, in particular a transition to an all-stainless steel assembly
- Delivery to the customer's site


CUSTOMER SATISFACTION


- Customer very satisfied regarding the performance of the solution
- Clarity of documents transmitted and exchanges
- Quality of technical support
- Responsiveness and availability highly appreciated
- Organization of the execution very satisfactory